Planning
AWP, 4D BIM (Synchro 4D), Primavera P6, Oracle Primavera Cloud (OPC) and O3. Schedules that reflect the reality of the field.
We combine AWP, 4D BIM (Synchro 4D), Primavera P6, Oracle Primavera Cloud and Artificial Intelligence to bring project planning to a standard that did not exist before in infrastructure, industrial and mining projects worldwide.
"We don't deliver Gantt charts. We deliver execution certainty."
Services designed for infrastructure, industrial and mining projects worldwide.
AWP, 4D BIM (Synchro 4D), Primavera P6, Oracle Primavera Cloud (OPC) and O3. Schedules that reflect the reality of the field.
Automated dashboards on schedule, CapEx and AWP. Executive-grade actionable insights.
A continuous line between Estimate, Master Schedule, Hours Budget and Control Schedule.
AWP methodology · 4D / BIM modelling
Advanced Work Packaging gives the project one code — the 3D / BIM model, Primavera P6 and Synchro 4D all read it. The model shows, package by package, what the schedule dates.
CWACWPIWP
Work-package structure (CWA, CWP, EWP, IWP), Path of Construction and coding dictionaries, set up on your own activity codes, WBS templates and resource names.
Model objects linked to coded resources, and resources to schedule activities, so Synchro 4D follows every P6 update instead of being re-linked by hand.
The link is data: injected into the XER and re-imported, so every object-to-activity link stays traceable.
Linked 4D model + mapping tables
Have a 3D model and a P6 schedule? We link one chain end to end. Talk to us → Read the 4D brief →
The suite · Ten canonical operations
The 14 DCMA checks, weighted, plus deep logic metrics, loop detection and inter-phase traceability.
Health score + the failing activities
Planned, earned and forecast physical S-curves straight from the P6 data — no spreadsheet formula drift.
S-curves, duration- or quantity-weighted
CPM Monte Carlo on the real network: probabilistic milestones and critical path.
P10–P95 dates + tornado
Revision against revision: added, removed and shifted activities, with lost actuals flagged.
Change table Rev A vs Rev B
Competing contractor schedules graded on one yardstick — same logic, same denominator.
Ranked, defensible tender scores
Executive milestone decks with multi-update overlay, editable by your own team.
PowerPoint, editable shapes
Publication-grade interactive Gantt: multi-project navigation, logic tracing, float analysis.
One self-contained HTML file
Labour hours or FTE per month for every schedule version in the P6 database — plan, actual, early and late forecast, by area and project.
HH / FTE curves · area › project × version
Schedule-to-model linking in Synchro through coding dictionaries, following the Path of Construction.
Linked 4D model + mapping tables
Group Champions model: one AI Champion per planning group prototypes LLM use cases and publishes a governed, token-efficient playbook the rest of the PMO reuses.
.md playbooks · one per group, in 4 weeks
And one standard running through all ten: adherence. Every operation is read against the approved baseline — dates, logic, scope and flow. Not an eleventh service; it is how the ten are done.
From 4D models to executive dashboards — what your team will see in their hands.
Mining plant rendered in Synchro 4D, color-coded by construction phase. Used for sequence validation and field interference detection.
Executive view in P6 with critical path, milestones and baselines on a single page.
Planned vs Actual progress over time. Cumulative and periodic data, executive-ready.
We use artificial intelligence to amplify the planner's work — not to replace it.
Automatic detection of logical inconsistencies and abnormal float values across hundreds of activities.
Structures aligned with the AWP framework from day one of the project.
Automated commentary on project data. Goodbye to the monthly copy-paste.
Validation of construction sequences in Synchro 4D, with early detection of field interferences powered by AI.
All under the supervision of planners with real field experience.
Four clear steps, from diagnosis to ongoing operation.
Real schedule status. XER audit, critical path analysis and float review.
AWP framework + WBS + 4D model aligned with the project scope.
P6, OPC, Synchro 4D, O3 and automated reporting configured and deployed with your team.
Ongoing reporting, monthly adjustments and program improvement cycle.
How we deploy automated schedule and CapEx reporting on your Primavera P6 portfolio.
How it lands · Relative weeks from t0, no calendar dates
Every phase exits through the same door: the DCMA-14 gate plus evidence validated by counting. Rollout depends on the portfolio; governance is permanent from week 13.
USD 200 per man-hour.
The man-hours budget depends on the complexity of the project portfolio and its schedules. We size it after the diagnosis phase. Request an estimate →
Tell us where your project stands and how we can add value from the planning side.
Pablo Villegas
contact@awplabs.cl
✆ WhatsApp +56 9 6516 7239
Santiago, Chile